Descargar Imprimir esta página

Jandy JEF-IN Instrucciones De Instalación página 7

Alimentador de erosión

Publicidad

Idiomas disponibles

Idiomas disponibles

Section 3. In Line Installation (JEF-IN)
DO NOT INSTALL chlorine feeder before the heating system. Damage
to the heating system may occur.
In order to prevent risk of serious property damage, injury or death:
Wear eye and skin protection while maintaining or servicing this unit.
Do not inhale fumes from the chlorinator or chemical container.
Chlorine feeder may be under pressure. Use caution removing cover.
NOTE: Install a Check Valve before the Erosion Feeder to prevent the backflow
of corrosive liquids and gases that may damage equipment.
1.
Install the dosing unit down-stream of the heating system, if no heating
system is installed down-stream of the filter, see Figure 3(a).
NOTE: Ideally, the dosing unit should be installed above water level, but below
the filter outlet level, in order to avoid the gases being trapped when
the pump is shut down. If the unit has to be installed below the pool
water level, isolating ball valves MUST also be installed before and
after the dosing unit in order to allow future maintenance. We strongly
recommend the fitting of a non-return valve to protect the equipment
room from chemical attack, should a situation arise where water
siphons back through the system.
2.
Determine the desired location on a pipe segment at least 16 inches long.
The dosing unit cannot be mounted on a vertical, or sloping pipe.
3.
Make the appropriate cuts in the pipe where you will be installing the cell.
4.
Connect the unit to the pipework via the ½" union connections using PTFE
tape. Do not overtighten.
CAUTION
WARNING
Page 7

Publicidad

loading

Este manual también es adecuado para:

Jef-off