Descargar Imprimir esta página

Glacier bay MODERN HD873X-6210H Guía De Uso Y Mantenimiento página 10

Grifo para banera y ducha con presion equilibrada, de una sola llave

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
6
Pressure testing and flushing
the installation
Make sure both stop valves (1) are fully open. If the stop valves (1) are closed, you must use athead
screwdriver to unscrew the valve rod in the stop valve (1) in a counterclockwise direction until the valve
rod can't be rotated.
Insert the test cap (N) into valve body (D). Slide the bonnet (2) over the test cap (N) and thread them onto the
valve body (D). Use plug (3, not included) to block the outlets of shower head and spout, then turn on the hot
and cold water supply lines and check if there are any leaks on the outlet pipe/tube connections or elbows.
Remove the plug/cap (3, not included), then turn on the hot and cold water supply lines and allow the water
to ow from the outlets for one minute or until all foreign matter has been ushed out.
Shut off the water supply lines. Remove the bonnet (2) and the test cap (N).
2
3
Clockwise
OFF
ON
Counter-Clockwise
3
N
1
D
3
10
D
1
3
D

Publicidad

loading