Descargar Imprimir esta página

Green GT30 Manual De Uso Y De Instalación página 11

Publicidad

Idiomas disponibles

Idiomas disponibles

5.
FAULTS
In the occurrence of any of the problems cited below, check the
available solutions:
PROBLEMS THAT
SOLUTION
MAY HAPPEN
Select cooling mode and then select the appropriate
temperature and speed.
Check for obstructions in the air outlets and/or
air entrance.
Not cooling
enough
Check if the Condenser surface is dirty.
Check if there is enough refrigerant in the system
and if the high and low voltage lines are normal.
Water on the
The formation of water droplets on the air outlet and
surface of the
core surface of the unit is a natural phenomenon in
Evaporator Box
humid environments.
Check the battery life and make sure that the power
Evaporator Unit
supply is DC 12 / 24V.
exhibits voltage
failure
Check if the low voltage protection is above normal.
Check if the temperature sensor is connected
correctly.
Evaporator unit
displays a sensor
Check if the display shows a higher temperature
failure
than the normal room temperature. If this is the
case, replace the sensor.
Low refrigerant.
Evaporator Unit
Check if the high and low voltage current are
displays fault in
normal.
the Condenser
Check if the Condenser is dirty.
Electrical box Green GT30s 24V - DS600031
20
Electrical box Green GT30 12V - DS600030
6.
INSTALLATION
INSTRUCTIONS
Before installing the air-conditioner for the first time, make sure
you have received all components and accessories.
ATTENTION: BOX WITH LOAD OF ISO VG 68 OIL AND
REFRIGERANT R134a CARRIED OUT!
1. Remove the original skylight from the
vehicle;
2. Apply the rubber sealant around the
roof opening;
3. Position the outer case of the air-conditioner
NOTE: The rubber seal must not block
the drainage holes located underneath
the box. The roof-mounted rubber seal
must be secured without cracks or
deformation to prevent water leakage
after installation of the unit;
4. Connect the power cable to the box;
5. Place the fixing brackets on the
threaded rods in the box and tighten
them with the self-locking nuts
6. After screwing the mounting brackets
together, fit the case trim onto the four
threaded rods and tighten them with
the self-locking nuts;
7. Add the caps to hide the screws;
8. Connect the power cable to the battery;
Electrical box Green GT30s 24V - DS600031
Electrical box Green GT30 12V - DS600030
ENGLISH
9. Turn on the air-conditioner and check
that the pressures of the high and
low pressure lines are within normal
parameters. (High Pressure: 150 to 180
psi / Low Pressure: 29 to 40 psi);
10. Run tests on all modes of operation
of the box and check that all functions
are working properly.
ATTENTION: Box with load
of iso vg 68 oil and refrigerant
r134a carried out!
21
21

Publicidad

loading

Productos relacionados para Green GT30

Este manual también es adecuado para:

Gt30sDs600030Ds600031