Descargar Imprimir esta página

Amana Distinctions ARS2664AB Manual Del Propietário página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Checklist
This checklist is for personal records only.
Consumer
Installer
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
Doors
Doors are aligned with each other. (After food has been added to refrigerator,
consumer should check door alignment).
Doors seal completely to refrigerator cabinet.
Handles are solidly attached to doors.
Ice 'N Water
TM
Dispenser Models
If doors were removed to instaII refrigerator, top hinge wire connectors are
reconnected.
Leveling
Refrigerator is stable.
Toe grille is properly attached to refrigerator.
Ice Maker
Water supply to refrigerator is turned on.
Water leaks are not present at connection between household water supply and
refrigerator. (After 24 hours, consumer should check connection for water leaks.)
Ice maker arm is in on position for ice production. (It may take up to 24 hours for
first harvest of ice.)
Product Literature
Owner's manual is reviewed including the following information.
Product registration card
Water filter installation and replacement (see water filtration package)
Refrigerator and freezer controls
Chiller Fresh T'' s ystem
Garden Fresh _ crispers
Normal operating sounds
Water
Filter (Some
models)
Bypass cartridge is removed and water filter is installed
Water leaks are not present around filter head
Filter indicator light function is explained (some models)
Notes
Consumer's
Signature
Installer's
Signature
InstaIIer's Company
Name/Phone
Number
Date

Publicidad

loading