Descargar Imprimir esta página

Flint & Walling 3CDH Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

Over 98% of all sump pumps returned to the factory are actually free from defects in material and workmanship, and can usually
be traced back to one of the below situations. Please keep this sheet available in the unlikely event your sump pump should ever
need maintenance.
1.
Make sure unit is plugged
into a 115 volt grounded
outlet that will not be turned
off by a wall switch.
2.
Be sure check valve is
installed and operating
properly. Replace check
valve if necessary.
3.
Unit needs to be sitting level
in the pit. A concrete block or
other material can be used
to achieve this.
TROUBLESHOOTING CHECKLIST
Union for
easy removal
Piping or
flexible hose
Check valve
© Copyright 2015. All rights reserved.
Power cord
Iron or
plastic pipe
Sump pit
Discharge
IL1878
3
4.
Check for dirt, rocks, mud
or stones under float rod.
This can keep the switch
mechanism from properly
turning on and off.
5.
Check for foreign objects in
the base. The bottom plate
can be removed to clean
the impeller by taking out
the sheet metal screws and
removing the plastic bottom
cover.
6.
NOTE: Some model sump
pumps include a nylon
screen. Lint and other build-
up should be removed from
screen area periodically.

Publicidad

loading

Este manual también es adecuado para:

3ceh5cdh3ce/3cd433063440752439877