04
Align the mounting holes and slots on the Vesa Plate with the nut inserts on the Vesa Mount. Bolt
through and secure with 4 x M8 Bolts and Washers.
05
Align the mounting holes on the Monitor Mount Uprights with the nut inserts on the Left and Right
Pedal Frames. Bolt through and secure with 8 x M8 Bolts and Washers.
06
Your Go Kart Direct Monitor Mount is complete.
Repeat
on Other
Side
7
Video Instruction: bit.ly/nlrbuild
PARTS:
• • 1 x Vesa Plate
• • 4 x M8 16mm Bolts
• • 4 x M8 Washers
PARTS:
• • 8 x M8 16mm Bolts
• • 8 x M8 Washers
• • Tip: Flex Monitor Mount Uprights
outwards slightly for ease of
installation and alignment.
PARTS:
• • NIL