Descargar Imprimir esta página

CF GROUP CF 400 CL Manual De Instrucciones página 39

Limpiador de piscinas sin cable

Publicidad

Note:
1. When using App, it needs to obtain Bluetooth use permission and
location permission of the mobile phone
2. App is suitable for ios14 and above, and Android 8.0 and above.
3. To obtain weather information in APP, you need to turn on Location
service.
• Installation of the filter basket
Reinstall the filter basket to the machine. The filter basket is aligned with the water inlet
and put into the cleaning machine. Put the cover plate on, make the filter basket fit
with the cover plate perfectly.
VI. Installa�on of floa�ng blocks (op�onal)
INSTALLATION OF FLOATING BLOCKS (OPTIONAL)
Floating blocks
Floating blocks
Attention:
1. Before installation, ensure that there is no water in the bonding
position.
2. There is adhesive on the back of the top floating block. When installing
POOL WATER CONDITION
the top floating block to the big cover, the edges of top floating block must
be glued properly. After 24 hours, the machine can be put into the pool for
Remark: The pool water condition must be within following parameters:
work.
• PH: 7.0-7.4
• Temperature: 50°F -95°F (10°C -35°C )
• Salt: Max. 5,000 ppm
• Chlorine: Max. 2 ppm
PIÈCES DÉTACHÉES
MAINTENANCE
APPENDIX
If the machine climbs the wall normally, the
following operations are not required. When
it is difficult for the machine to climb the wall,
When it is difficult for the machine climb
it cannot clean the waterline, and may tilt
the wall, it cannot clean the waterline,
seriously. Solve the problems according to the
figure. After removing the adhesive, stick the
and it tilts seriously when climbing the
two top floating blocks to the machine. Carry
wall, solve the problems according to the
out installation according to (Figure 6-1).
figure. If the machine climbs the wall
normally, the following operations are
not
Attention:
adhesive, two top floating blocks are
1 • Before installation, ensure that there is no
attached to the machine. Carry out
water in the bonding position.
installation according to (Figure 6-1).
2 • There is adhesive on the back of the top
floating block. When installing the top
floating block to the big cover, the edges of
Figure 6-1
Figure 6-1
top floating block must be glued properly.
After 24 hours, the machine can be put
again into the pool for work.
35
required.
After
12
removing
the

Publicidad

loading

Este manual también es adecuado para:

107220