Descargar Imprimir esta página

Textron RANSOMES Parkway 2250 Plus Manual De Mantenimiento página 14

Publicidad

Idiomas disponibles

Idiomas disponibles

5
LUBRICATION AND MAINTENANCE
LUBRICATION.
5.3
ENGINE - Diesel: First 50 working hours
and every 200 working hours.
Change Engine Oil.
(a)
Warm up the engine first and then shut it
off. Remove oil drain plug from the bottom
of the crankcase and wipe it off.
(b)
Replace the drain plug and fill engine with
6.4 litres of oil.
Change Engine Oil Filter.
(a)
Remove single-unit cartridge (A)
(b)
Apply thin coat of oil to cartridge gasket
before installing.
(c)
Tighten filter by hand only.
(d)
Check for oil leaks around the cartridge
gasket after engine is started.
5.3.1 ENGINE - LPG: Every 200 working hours.
Change Engine Oil.
(a)
Warm up the engine first and then shut it
off. Remove oil drain plug from the bottom
of the crankcase and wipe it off.
(b)
Replace the drain plug and fill engine with
3.1 litres of oil.
Change Engine Oil Filter.
(a)
Remove single-unit cartridge (A)
(b)
Apply thin coat of oil to cartridge gasket
before installing.
(c)
Tighten filter by hand only.
(d)
Check for oil leaks around the cartridge
gasket after engine is started.
GB-12
RANSOMES PARKWAY 2250 PLUS
MAINTENANCE MANUAL

Publicidad

loading

Este manual también es adecuado para:

Lgnn040Lgnn100