Descargar Imprimir esta página

Primer DS-11 Manual De Uso Y Mantenimiento página 93

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 18
8- Replace the solenoid valve plug (C).
9- Remove the manometer pipe.
10- Tighten bolt (B).
-When the machine has been modified to work with a different type of gas to that
specified, put the corresponding new name plate and yellow label on it, which is
inside the plastic bag of the new injectors.
3.7.
Steam connection (Only steam models)
The installation of the dryer with steam heating (powered at high or low steam pressure), must
meet current standard regulations.
The dryers normally work at pressures ranging from 600 KPa to 900 KPa. Check the pressure
on the CE plate and connect the correct operating pressure.
The location of the steam input is shown in the figures given in section 3.9.
The steam installation must be made such that the steam reaches the machine in optimum
conditions. Without condensation and free of impurities.
The manual shut-off valve should be installed at the input to the machine for maintenance
purposes. A filter should also be fitted.
Some instructions with regard to the steam installation:
The main pipe must have a negative slope of 1%.
The connection between the main pipe and the bypass should be in the upper
part of the principal line.
The bypass pipe to the machine shall have a negative slope and it must not be
possible for condensation to build up in any of the syphons.
All manuals and user guides at all-guides.com
91

Publicidad

loading

Este manual también es adecuado para:

Ds-17Ds-23Ds-28dDs-35dDl-11Dl-17 ... Mostrar todo