ASSEMBLY INSTRUCTIONS
13. Attach top panel (A) to top frame (B), secure in place
with M4 x 35 mm screws (BB).
Hardware Used
BB
M4 x 35 mm Screw
14. Attach pole holders (FF) to metal pole (I), securing
with M4 x 15 mm bolts (EE).
Hardware Used
EE
M4 x 15 mm Bolt
FF
Pole Holder
15. Attach pole holders (FF) to top frame (B), using 1/4
in. x 12 mm bolts (AA). Tighten with hex wrench (CC).
Hardware Used
AA
1/4 in. x 12 mm Bolt
CC
Hex Wrench
13
x 8
BB
14
I
x 2
x 2
I
15
x 4
x 1
CC
AA
11
ASSEMBLY INSTRUCTIONS
16. Drawer installation
B
A
a. Extend the ball bearing slide tracks on the unit all
the way forward (including ball bearing cart).
b. Align the slide runners on the assembled drawers
with the slide tracks and push the drawer carefully
inside until it stops.
NOTE: If the drawer does not go in smoothly, please
take it out and repeat the step. If you need to remove
the drawer, please pull the drawer all the way out, then
simultaneously pushes the plastic release lever of the
ball bearing slides up on one side and down on the other
side, and then pull it completely out.
17a. Adjust floor levelers to level the unit against the wall
where desired.
17b. Using top frame (B) as a template, mark one
mounting holes location on the wall. Drill one pilot
FF
holes into the wall where previously marked. Make
sure that the drilled holes can fit for the wall anchors
(sold separately) properly. Press the anchors into the
holes and gently tap with a hammer until flush in the
holes. If the mounting hole coincides with a wooden
stud, there is no need wall anchor.
17c. Align top frame (B) and back crossers (NN) over the
drywall anchors (GG) and secure with M5 x 65 mm
EE
screw (OO). Tighten securely with phillips screwdriver.
FF
Hardware Used
GG
Drywall Anchor
B
Back Crosser
NN
M5 x 65 mm
OO
Screw
18. If you buy more than one unit, you can collect more
style.
FF
16
17
GG
NN
B
OO
x 1
18
x 1
x 1
12
Wall