INS_810-5504-S.qxd
11/15/10
FOR COVERS, ACCESSORIES AND OTHER PRODUCTS, PLEASE VISIT US ONLINE AT:
We recommend two people work together when
assembling this unit.
The following tool is required to assemble this
Vertical Smoker:
• Adjustable Wrench
• Phillips Screwdriver
PARTS LIST - VERTICAL SMOKER:
1 Smoker box
1
2 Cooking grills
2
1 Water pan
3
1 Water pan bracket
4
1 Wire Rack
5
4 Legs
6
1 Charcoal pan
7
2 Door handles with springs, washers
8
and door retaining brackets
1 Temperature gauge
9
2 Side handles
10
8 Side rails
11
4 Air vent dampers
12
PARTS BAG CONTAINS:
24 M6 X 12 mm Phillips head bolts
8 M6 nuts
4 Star washers
3
5:34 PM
Page 4
ASSEMBLY INSTRUCTIONS
READ ALL SAFETY WARNINGS & ASSEMBLY INSTRUCTIONS CAREFULLY
BEFORE ASSEMBLING OR OPERATING YOUR SMOKER.
(Proof of purchase will be required.)
Inspect contents of the box to ensure all parts are included and undamaged.
8
1
2
3
4
5
7
6
9
10
12
11