Installation Instructions:

Accessibility, Orientation & Fittings
Always mount the vitapur
in a location that provides ample space for accessing
®
the ultraviolet lamps. Service may require removing the UV lamp and quartz tube.
A minimum distance equivalent to the length of the UV reaction chamber (stainless
steel cylinder) plus 6-12" (15-30cm) is required to ensure adequate clearance. As
the vitapur
®
UV disinfection system generates heat during use, please ensure that
no combustible items come into contact with, or are in proximity to the system. It is
recommended that you maintain at least 6" (15 cm) of clear wall space on all sides of
the vitapur
for cooling purposes. This will prolong the operating life of the system.
®
Installation Instructions:
Optional Bypass Line and Drain Valve Installation
To prevent contamination of water in the plumbing, which may pose a health hazard,
do not use the bypass line and valve if your source of supply is untreated surface
water or groundwater. If your source of supply is treated municipal water, use of
the bypass line and valve will permit uninterrupted treated water service in the
event of a system malfunction. Always test the bypass valve following each use of
the bypass line, prior to re-starting the vitapur
that the valve has been fully closed and that only water from the outlet port will be
going downstream. The installation of a drain valve, while not required for system
operation, is recommended for all installations of the vitapur
The installation of a drain valve will allow the service technician to drain the system
of water prior to conducting any service on the unit.
Recommended installation of the vitapur
1. Source
2. Pre-treatment equipment (softener/filter)
3. Shut-off valve
4. 5 micron sediment filter
5. UV system
6. Shut-off valve
7. Sample valve
8. Cold & hot water lines
Installation Instructions:
Installation of System
• System Orientation – With the exception of the VPL-12, all VPL systems should be
installed horizontally, with the inlet port at the base and the outlet port at the top
of the system, as shown below. For the VPL-12, the system is installed so that
both the inlet and outlet ports are both at the top of the system. The VPL-12
should not be wall mounted due to its weight and size.
5
UV disinfection system to confirm
®
UV disinfection system.
®
®
UV disinfection system is as follows:
System Orientation
Inlet
VPL-2 Installation Orientation
(System can be wall mounted wih supplied brackets)
Inlet
VPL-6 and VPL-8
Installation Orientation
(System can be wall mounted wih supplied brackets)
Inlet
VPL-12 Installation Orientation
(Due to the size and weight of the system, installation must be on a soid surface)
Ballast
Gland Nut
UV Bulb
Safety Cover
Outlet
Outlet
Outlet
Drain Valve
Quartz Sleeve
Gland Nut
Silicone Ring
6

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vpl-6Vpl-8Vpl-12

Tabla de contenido