Measuring Station; Base Station - Hama EWS-200 Instrucciones De Uso

Ocultar thumbs Ver también para EWS-200:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
• When inserting the batteries, make sure that the polarity is
correct ('+' and '-' markings). Failure to do so could result
in the batteries leaking or exploding.
• Only use batteries (or rechargeable batteries) that match
the speci ed type..
• Do not charge batteries.
• Keep batteries out of the reach of children.
• Do not short circuit the batteries/rechargeable batteries
and keep them away from uncoated metal objects.
4. Getting Started

4.1. Measuring station

• Open the battery compartment (33) and insert two AA
batteries with the correct polarity.
• Press the CH button (32) repeatedly to select the channel the
measuring station is to use for transmission. CH1, CH2 or
CH3 is shown on the display (29).
• Select CH1 if you are only using the measuring station
supplied.
• Close the battery compartment.
Note
Before use, ensure you insert the batteries in the measuring
station rst and then in the base station.

4.2. Base station

• Open the battery compartment (28) and insert two AAA
batteries with the correct polarity. Close the battery
compartment.
5. Installation
Note – Installation
• We recommend initially placing the base and measuring
stations in the intended locations without installing them
and making all the settings described in 6. Operation
– to do.
• Only install the stations once the appropriate settings have
been made and a stable wireless connection is established.
Note
• The wireless transmission range between the measuring
and base stations is up to 30 m in open spaces.
• Before installation, ensure that wireless transmission will
not be disrupted by interference or obstacles like buildings,
trees, vehicles, high-voltage lines, etc.
• Before the nal installation, ensure that there is su cient
reception between the intended installation locations.
• When installing the measuring station, ensure that it is
protected from direct sunlight and rain.
• The international standard height for measuring air
temperature is 1.25 m (4 ft) above ground.
Warning
• Buy special or suitable installation material from a
specialised dealer for wall-mounting.
• Ensure that no faulty or damaged parts are installed.
• Never apply force during installation. This could damage
the product.
• Before installation, ensure that the chosen wall is suitable
for the weight to be mounted, and make sure that there
are no electrical wires, water, gas or other lines at the
installation site on the wall.
5.1. Base station
• Use the base to position the base station on a level surface.
5.2. Measuring station
• You can also position the measuring station on a level
outdoor surface.
• We recommend installing the measuring station securely on
an outdoor wall using the opening (31).
• Install an anchor, screw, nail, etc. in the wall of your choice.
• Hang up the base/measuring station using the opening
intended for this purpose.
6. Operation
Note – Input
Hold down the UP button (23) or the DOWN/MEM button
(24) to select the values faster.
6.1. Connection to the measuring station
• After you insert the batteries, the base station automatically
searches for a connection to the measuring station and
performs initial setup.
Note
• Initial setup takes approx. 3 minutes.
• During connection, the wireless symbol on the measuring
station will ash (17).
• Do not press any buttons during setup. Otherwise, values
may not be transmitted correctly and there is a risk of
value errors and inaccuracies.
• The setup process is completed when the indoor (5, 16)
and outdoor (8, 18) measurement data is displayed.
• If the base station still does not receive a signal from the
measuring station, press and hold the CH-button (25) for
approx. 3 seconds to start the manual search for the signal.
3

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

0018631000136222

Tabla de contenido