Installation; Procedures For Drill Stand Installation - Husqvarna DS 500 Manual Del Usuario

Ocultar thumbs Ver también para DS 500:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Fold the drill stand column fully rearward. Refer to
To adjust the angle of the drill column on page 10 .

Procedures for drill stand installation

There are 3 procedures that can be used to attach the
drill stand before a drill operation:
With an expander bolt.
With a vacuum plate.
With a rod that has a thread, a washer and a locknut
To attach the drill stand with an expander bolt
WARNING: When drilling ceilings and walls,
only expander or anchor suitable for
surfaces exposed to tensile forces should be
used. Use only expander or anchor which is
approved for current application.
922 - 002 - 06.03.2019
3. Remove the 4 bolts from the hinge bracket.
4. Remove the drill stand column.
5. Install the drill stand column in the opposite
sequence.

Installation

1. Make a hole for the expander bolt. Refer to
the expander bolt on page 8 . Measure a distance
(A) of 335 mm (13.2 in.) from the center of the hole
that you will drill. If you use the quick spacer
(assessory), the distance changes. Refer to
spacer (accessory) on page 6 .
2. Attach the bottom plate with an expander bolt.
3. Make sure that the drill stand is tightened correctly.
To attach
Quick
A
7

Publicidad

Tabla de contenido
loading

Tabla de contenido