1 Table of contents
Contents
1
Table of contents
2
Product information
3
Abbreviations
4
Overviews
5
Planning
6
Calculation
7
Pre-assembly
8
Assembly
6
4.1
Overview of left-hand systems
4.2
Overview Connector 55 (optional)
4.3
Overview Connector 110 with and without plinth (optional)
4.4
Overview of position numbers
5.1
Planning inlaying door
5.2
Planning door striking against the top and bottom cabinet section with Connector 55
5.3
Planning door striking against the top and bottom cabinet section with Connector 110
5.4
Planning door in wall recess
6.1
Calculation door weight / height ratio
6.2
Calculation plan view dimensions
6.3
Calculation hardware depth
6.4
Calculation drill hole positions
7.1
Pre-assembly: Processing the left profile
7.2
Pre-assembly: Processing the right profile
7.3
Pre-assembly door
7.4
Pre-assembly cabinet body
7.5
Pre-assembly exterior side
7.6
Pre-assembly stop shock absorber
7.7
Pre-assembly upright
7.8
Pre-assembly: Aligning the cabinet
8.1
Assembly scissor and bar installation, left-hand systems
8.2
Assembly scissor and bar installation, right-hand systems
8.3
Assembly: Positioning the stop shock absorber
8.4
Assembly door
8.5
Assembly: Fine adjustment of door upright angle 19 - 30 mm
8.6
Assembly: Fine adjustment of door upright angle 31 - 50 mm
8.7
Assembly: Closing door with scissor bearing
8.8
Assembly: Adjusting the door height
8.9
Assembly: Door gap fine adjustment
8.10
Assembly: Front depth fine adjustment
8.11
Assembly: Keeping the door open
Page
6
7
12
13
14
15
16
17
18
19
20
21
22
24
25
26
27
28
29
31
32
32
33
34
37
40
41
42
43
44
45
46
47
48