Pre Operational Checks; Transport - Husqvarna Soff-Cut 150 Manual De Instrucciones

Ocultar thumbs Ver también para Soff-Cut 150:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLING AND ADJUSTMENTS
Turn the plunge adjustment screw clockwise by hand until
it touches the guide wheel shaft.
Back off a quarter turn (counter-clockwise) and lock in
place by tightening the Plunge adjustment jam nut.
Chase an existing saw joint for approximately one foot to
verify that the proper decorative cut is achieved.

Pre operational checks

The engine is delivered without oil. Fill with engine oil to the
correct level. Refer to Technical Data for recommendations on
which oil type to use.

Transport

Remove the locking pin.
Fold the handle forward.
Fold the guide arm back.
The saw should be lifted from the center handle on the roll
cage.
– 13
English

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Soff-cut 150 d

Tabla de contenido