GRE MARBELLA Manual De Instrucciones página 54

Tabla de contenido

Publicidad

The (Y) concrete sleeper should have the following dimensions: Y
All the sleepers must be levelled with each other for the pool to be perfectly level. The indicated dimensions and distances
must be respected for correct assembly.
When the concrete is dry, the pool structure can be placed on top. The distance between the centres of the columns is
1400 mm.To do that, follow the next pages of this manual.
When the structures have been assembled on top of the concrete slabs, the entire structure must be fully covered with
soil/sand. The terrain must be well-compacted for correct assembly of the pool. Pieces (AP) must be covered by at least
2cm of sand.
PARTIAL OR COMPLETELY IN-GROUND INSTALLATION
According to the nature of the land, you should install a peripheral drainage and connect it to a decompression well. The well will be
excavated before the construction of the pool to avoid that the excavations fill with water during the works. It should be near the pool,
a few centimetres lower than the deepest point of the same and reach up to the surface. The decompression well is located at the
most humid point. It acts as an overflow in the case of water infiltrations or clay soil, starting from the fact that water rises quicker
through a tube than through the soil.
Natural
Anti-roots or felt
ground
Geotextile
blanket
Layer of
stabilized
gravel
Y
B
90cm
Protection and
alveolar draining
roll of HDPE
Watertight
Peripheral
film
drainage
5200cm
Y
A
Y
A
= 370x50x15cm Y
A
Wood
Draining gravel
frame
ø10-30
Respect the direction of the
alveolar protection roll, with
the bubbles against the wall, to
allow the wood to "breathe".
Descompression
l
wel
54
Ref. 790096
3700cm
=520x50x15cm.
B
1
2
1- Wood frame
2- Roll of alveolar protec-
tion an drainage of HDPE
Concrete
slab

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

RosemaryMango790096Kpbrc420Kpbrc620

Tabla de contenido