General Instructions; Place Of Installation; Plumbing Connections; Important - Ferroli ATLAS D ECO 30 SI UNIT Instrucciones De Uso, Instalación Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 15
If the room temperature is lower than the required value, it is advisable to set a higher
order curve and vice versa. Proceed by increasing or decreasing in steps of one and
check the result in the room.
90
85
80
70
60
50
40
30
20
20
10
fig. 14 - Compensation curves
90
10
9
8
7
85
6
80
5
70
4
60
3
50
2
40
1
30
20
fig. 15 - Example of compensation parallel curve offset
Adjustments from Remote Timer Control
If the Remote Timer Control (optional) is connected to the boiler, the above ad-
A
justments are managed according to that given in table 1. Also, the control pan-
el display (detail 5 - fig. 1) shows the actual room temperature read by the
Remote Timer Control.
Table. 1
Heating temperature adjustment Adjustment can be made from the Remote Timer Control menu and the boiler
control panel.
Summer/Winter Switchover
Summer mode has priority over a Remote Timer Control heating demand.
On disabling DHW from the Remote Timer Control menu, the boiler selects the
Economy mode. In this condition, the button 7 - fig. 1 on the boiler panel is dis-
abled.
Eco/Comfort selection
On enabling DHW from the Remote Timer Control menu, the boiler selects the
Comfort mode. In this condition it is possible select one of the two modes with
the button 7 - fig. 1 on the boiler panel.
Sliding Temperature
Both the Remote Timer Control and the boiler card manage Sliding Tempera-
ture adjustment: of the two, the boiler card Sliding Temperature has priority.
Hydraulic system pressure adjustment
The filling pressure with system cold, read on the boiler hydrometer, must be approx. 1.0
bar. If the system pressure falls below the minimum value, the boiler card will activate
fault F37 (fig. 16).
fig. 16- Insufficient system pressure fault - Filling cock
Operating the filling cock (Detail 1 - fig. 16), bring the system pressure to a value above
1.0 bar.
Once the system pressure has been restored, the boiler will activate the 120-
A
second air venting cycle indicated by the display with FH.
At the end of the operation, always close the filling cock (detail 1 - fig. 16)
30
EN
10
9
8
7
6
5
4
3
2
1
0
-10
-20
90
10
9
8
85
80
70
60
50
40
30
20
cod. 3541Q540 - Rev. 00 - 09/2018
3. INSTALLATION

3.1 General Instructions

BOILER INSTALLATION MUST ONLY BE PERFORMED BY QUALIFIED PERSON-
NEL, IN ACCORDANCE WITH ALL THE INSTRUCTIONS GIVEN IN THIS TECHNICAL
MANUAL, THE PROVISIONS OF CURRENT LAW, THE PRESCRIPTIONS OF NA-
TIONAL AND LOCAL STANDARDS AND THE RULES OF PROPER WORKMANSHIP.

3.2 Place of installation

The boiler unit must be installed in a specific room with ventilation openings to the out-
side as prescribed by current regulations. If there are several burners or suction units
that can work together in the same room, the ventilation openings must be sized for si-
multaneous operation of all the units. The place of installation must be free of flammable
materials or objects, corrosive gases, powders or volatile substances that, conveyed by
the burner fan, can obstruct the internal lines of the burner or the combustion head. The
room must be dry and not exposed to rain, snow or frost.
If the unit is enclosed in a cabinet or mounted alongside, a space must be pro-
A
vided for removing the casing and for normal maintenance operations.

3.3 Plumbing connections

Important

The heating capacity of the unit must be previously established by calculating the build-
ing's heat requirement according to the current regulations. The system must be provid-
ed with all the components for correct and regular operation. It is advisable to install
shutoff valves between the boiler and heating system allowing the boiler to be isolated
from the system if necessary.
7
6
5
4
B
The safety valve outlet must be connected to a funnel or collection pipe to pre-
3
vent water spurting onto the floor in case of overpressure in the heating circuit.
Otherwise, if the discharge valve cuts in and floods the room, the boiler manu-
2
facturer cannot be held liable.
1
Do not use the water system pipes to earth electrical appliances.
Before installation, flush all the pipes of the system thoroughly to remove any residuals
or impurities that could affect proper operation of the unit.
Carry out the relevant connections according to the diagram in cap. 5 and the symbols
given on the unit.
High efficiency circulating pump
For proper operation of the boiler ATLAS D ECO SI UNIT, the speed selector (see
fig. 17) must be set to position III.
Characteristics of the water system
In the presence of water harder than 25° Fr (1°F = 10ppm CaCO3), use suitably treated
water in order to avoid possible scaling in the boiler. Treatment must not reduce the hard-
ness to values below 15°F (Decree 236/88 for uses of water intended for human con-
sumption). Treatment of the water used is indispensable in case of very large systems
or with frequent introduction of replenishing water in the system.
Antifreeze system, antifreeze fluids, additives and inhibitors
The boiler is equipped with an antifreeze system that turns on the boiler in heating mode
when the system delivery water temperature falls under 6°C. The device will not come
on if the electricity and/or gas supply to the unit are cut off. If it becomes necessary, it is
permissible to use antifreeze fluid, additives and inhibitors only if the manufacturer of
these fluids or additives guarantees they are suitable for this use and cause no damage
to the heat exchanger or other components and/or materials of the boiler unit and sys-
tem. It is prohibited to use generic antifreeze fluid, additives or inhibitors that are not ex-
pressly suited for use in heating systems and compatible with the materials of the boiler
unit and system.
ATLAS D ECO SI UNIT
4
7
fig. 17
Min
.
1
I
II
III

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Atlas d eco 42 si unitAtlas d eco si unit

Tabla de contenido