Simer 3410P Manual Del Usuario página 5

Bomba centrifuga resistente a la corrosion para rociadores de cesped
Ocultar thumbs Ver también para 3410P:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

installation
5
DRIVEN
POINT
iNSTALLATiON
Step 1. Connect
suction
pipe to (]rive point (Figure 2).
Keep horizontal
pipe run as short as possible.
Use Teflon tape on male pipe threads.
Multiple
we]] points may be necessary to provide
suffi-
cient water to pump.
Step 2. Install check valve in horizontal
pipe. Flow arrow
on check valve must point toward
pump.
Discharge
Pipe
Gate
To sprinkler
valve
Pipe
Figure 2: Driven
Point }nstdiation,
Multiple
Well Points
HORIZONTAL
PiPiNG
FROM
WELL TO PUMP
Step 1. Pump performan(e
will
be decreased
if less that
1-1/2" pipe is used as suction
pipe.
Step 2. To aid priming
on well point
installations,
install
line check valve. Be sure check valve flow arrow
points toward
pump.
DISCHARGE
PIPE SIZES
Discharge
pipe size should
be increased
to redu(e
pres-
sure losses caused by friction
on long pipe runs.
• Up to 100' (30.5 m) run: Same size as pump dis-
charge port.
100' - 300' (30,5 - 91,4 m) run: Increase one pipe
size.
• _00' - 600' (91.4 - 182.9 m) run: Increase two pipe
sizes.
LAWN
SPRINKLING
APPLICATION
This pump is designed
for lawn sprinkling,
Delivers
plen-
ty of water at full sprinkler
pressure.
Pumps from pond,
cistern or we]] points.
Pump discharge
can be divided
to supply 4 or more
sprinkler
systems.
Do not use in booster pump applications.
PUMP/PIPING
INSTALLATION
If turning
pump on and off by pressure,
a pressure switch
and tank are required.
For proper
installation
and opera-
tion instructions
call Customer
Service.
Use rigid pipe. Do not use hose or plastic tubing.
See
"VVeII Pipe Installation"
for more information,
NOTICE:
Use only Teflon tape or Teflon based joint com-
pounds for making all threaded
connections
to the pump
itself, Do not use pipe joint compounds
on plastic
pumps: they can react with the plastic in pump compo-
nents. Make sure that all pipe joints in the suction
pipe
are air tight as well as water
tight. If tile suction pipe (:an
su(k ail, tile pump
will not be able to pull
water from the
well.
Step 1,
Step 2,
Step _,
Bolt pump to solid, level foundation.
Support
all piping
connected
to pump.
Wrap 1-1/2 to 2 layers of Teflon tape clockwise
(as you face end of pipe) on all male threads
being attached
to pump.
Step 4. Tighten joints
hand tight plus 1-1/2 turns. Do not
overtighten.
Step 5. Replace
prime plug with pressure gauge. This
will aid in sizing zones, troubleshooting,
and fol-
lowing
pump performance
chart.
NOTICE:
Install pump as close to well head as possible.
Long piping
runs and many fittings create friction
and
reduce flow.
NOTICE:
For long horizontal
pipe runs, install a priming
tee between
check valve and well head (Fig. 1). For dri-
ven point installations,
install check valve. Be sure that
check valve flow arrow points toward
pump.
I
For parts or'assistanCe'call Sirner CustOmer Service at
1=800468,7867 ! 1.800=546=7867
I

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

3415p3420p

Tabla de contenido