3 SETUP
3.1
Initial activities
3.1.1
Delivery content
Please check the product contents immediately after receipt for any eventual transport
damage or missing parts. Claims from transport damage or missing parts must be
placed immediately after initial machine receipt and unpacking before putting the ma-
chine into operation. Please understand that later claims cannot be accepted anymore.
3.1.2
Workplace requirements
The workplace has to fulfil the requirements stated in section 2.
The ground has to be even, in level and hard. It must be suitable at least to weight it
with double weight per square meter than the machines net weight.
The chosen workplace must have access to a suitable electric supply net hat complies
with the machines requirements.
The machine must be placed in a way that for all chosen angles from 0-60° there should
be at least 0.8m room free space around the machine.
For longer workpieces sufficient additional place before and behind the machine should
be calculated.
3.1.3
Transport
The machine can be transported in it`s package with a forklift.
The machine is very heavy. The machine shall be lifted from it`s crate with a suitable
lifting device only that is certified to be able to carry the machines load.
3.1.4
Preparation of the surfaces
Uncoated metal machine parts have been insulated with a greasy layer to inhibit corrossion.
This layer has to be removed. You can use standard solvents that do not damage the ma-
chine surface.
HOLZMANN Maschinen Austria
Bedienungsanleitung Metallbandsäge BS 128HDR
The transport and the lifting of the machine shall be per-
formed by qualified and respectively trained persons on-
ly.
Do not use solvents based on nitrite, aggressive solvents like break
cleaners or scrubbing agents!
These damage the machine surface.
www.holzmann-maschinen.at
W A R N I N G
N O T I C E
MONTAGE
Seite 24
Metallbandsäge BS 275GP