Transport, Storage - Ecler BET ACOUSTICS MASS1015P Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TRANSPORT, STORAGE

The most practical and usual way of transporting the BET ACOUSTICS MASS1015P system is in
configured clusters. In this way the configuration of the vertical coverage of the system can be
maintained in addition to enabling transport of the iron elevation fittings installed in the same cluster.
CALIBRATION OF VERTICAL COVERAGE
The calibration of vertical coverage of the system is easily carried out prior to being flown. The
positions of the pins are altered as indicated on the silk-screen print on the lateral, frontal iron fitting, the
intervals of the positions being 1º.
The positions of the pins of the rear laterals are not changed as the rear mechanism is only
intended to serve as a hinge.
DESCRIPTIVE DIAGRAMS
The following diagrams describe each of the acoustic enclosures of the BET ACOUSTICS
MASS1015P system as well as its various flying parts.
1- The system includes four handles, two on each side, both strategically placed for maintaining
equilibrium during individual transport. The orifices of the two handles on the right side of the system act
as bass resonators.
2- There are four rabbets at the top of each unit which serve to accommodate the skids of the unit
stacked on top.
3- At the bottom of each unit there are four skids that are inserted in the unit stacked below.
4- The lateral iron fittings together with the "strut" connecting rods serve as hinges.
5- The lateral, front iron fittings calibrated degree for degree determine the vertical angle between each
of the units.
6- Connecting rod that serves as a strut.
7- 9.8 mm diameter pin with magnetic head.
REAR
4
14
LATERAL
7
2
1
3
6
5º-
4º-
3º-
2º-
1º-
0º-
FRONT
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dpm3003

Tabla de contenido