6. Check the burner pressure.
Warning
This check may only be performed by
a suitably authorised person.
The toestellen are adjusted and
regulated for use on natural gas G25
(I2L).
7. To connect an outside-air suction device
to the combustion air fan inlet (only for
AGA 102), see chapter 9.
8. If the heater is provided with a room
thermostat or time clock, connect it to the
appropriate connection (E) of the
operating panel (fig. 8). This connection
has as a rule been provided with a plug
to which the contacts are connected.
9. To connect and adjust the power add-on
RE-LT6 or the temperature controller RE-
THA6, please contact your dealer.
10. Insert the plug into the socket.
Reverse the connector in the socket if
the orange indicator lamp (fig. 8A)
lights up on the operating panel.
The plug must always be accessible.
3.3
Preparing for start-up
Check if the heater is correctly
adjusted for the locally-supplied gas
(consult the dealer).
Settings RE-LT6 (fig. 12):
1. Set the rotary switch (A) to "DAUER" if
the heater is to operate at maximum
capacity at all times.
2. Set the rotary switch to "AUTOM" if the
heater is to operate in modulating mode.
Settings RE-THA6 (fig. 13):
1. Set the selector switch (A) to "II" if the
heater is to operate at maximum capacity
at all times. The green indicator (B) is
on).
2. Set the selector switch to "I" if the heater
is to operate in modulating mode. The
green indicator (B) is on.
AGA 100/102
3.4
Heat:
1. Open the gas cock.
2. Switch the selector switch (D) to heat,
see fig. 8.
Ventilate:
1. Switch the selector switch (D) to
ventilate, see fig. 8.
4
4.1
4.2
1. Switch the selector switch to 0.
2. Close the shut-off valve on the gas
supply.
40.020.954 - rev. 05 - 2017
Starting up
USE
During operation
Hot
Do not touch the blower outlet! The
blower outlet becomes hot during
operation!
Switching off
English
19