Winterizing The Pump - STA-RITE PL Serie Manual Del Usuario

Bombas convertibles tipo “jet” para pozos profundos
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Preparing to Start the Pump – Shallow Well
Open control valve
as far as possible
and fill pump and
piping through
priming port
or priming tee.
284 0395
Figure 15: Open Control Valve
For parts or assistance, call Sta-Rite Customer Service at 1-888-782-7843
Priming
Explosion hazard . Never run pump against closed discharge.
To do so can boil water inside pump, causing hazardous pressure in unit,
risk of explosion and possibly scalding persons handling pump.
Never run pump dry . Running pump without water may cause
pump to overheat, damaging seal and possibly causing burns to persons
handling pump. Fill pump with water before starting.
1. Open the control valve as far as possible (see Figure 15). Then remove
the priming plug from the pump and fill the pump, fill all piping
between the pump and the well, and make sure that all piping in
the well is full. If you have also installed a priming tee in the suction
piping, remove the plug from the tee and fill the suction piping.
2. Replace all fill plugs. Leave the control valve open (in a shallow well
installation, the control valve always stays open).
3. Power on! Start the pump. The pump should pump water in two or
three minutes.
4. If you don't have water after 2 or 3 minutes, stop the pump and remove
the fill plugs. Refill the pump and piping. You may have to repeat this
two or three times in order to get all the trapped air out of the piping.
The control valve remains open throughout this procedure.
5. After the pump has built up pressure in the system and shut off, check
the pressure switch operation by opening a faucet or two and running
enough water out to bleed off pressure until the pump starts. The pump
should start when pressure drops to 30 PSI and stop when pressure
reaches 50 PSI. Run the pump through one or two complete cycles to
verify correct operation. This will also help clean the system of dirt and
scale dislodged during installation.
6.
(PL Series pumps only). Check for leaks around band clamp. If pump is
leaking, tighten clamp nut 1-2 turns. Do not overtighten.

Winterizing the Pump

To prepare the pump for freezing temperatures:
1. Shut off power to the pump.
2. Relieve system pressure. Open a faucet and let it drain until water
stops flowing.
3. Drain the pump. Your pump may have a separate drain plug. Remove
this plug and let it drain.
Your pump may only have a plug or connection on the side of the
pump. Remove this and let the pump drain. Some water will remain in
the pump. A small amount of water left in the pump will not harm it if
it freezes.
9

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

FlcFlc fslchFldFld fsldhPlfPlb-2l ... Mostrar todo

Tabla de contenido