Dometic COOLAIR SP 950C Instrucciones De Montaje página 8

Bastidor de fijación para scania highline/topline
Ocultar thumbs Ver también para COOLAIR SP 950C:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 15
Guarantee
Fit the fastening frame and the condenser at the Scania Highline/Topline as follows:
➤ Bolt the condenser unit to the mounting frame with the M8 x 30 hexagon bolts,
M8 8.4 x 16 mm U-washers and M8 retaining nuts (fig. 1, page 3).
➤ Remove the existing screws (fig. 2 1, page 4).
I
NOTE
Make sure the long side (fig. 2 A, page 4) of the spacer is pointing
towards the rear wall of the truck.
➤ Fasten the spacer (fig. 2 2, page 4) in place of the removed screw using the
M8 x 25 ribbed bolt (fig. 2 3, page 4).
➤ Remove the existing nuts (fig. 2 6, page 4).
➤ Install the mounting frame using the fastening material provided:
– Attach at the top with the M8 (fig. 2 6, page 4) serrated lock nuts
– Attach to the spacer you installed earlier with retaining nut M8 (fig. 2 4,
page 4) and bolt M8 x 16 (fig. 2 5, page 4)
➤ Check that all bolts are still tight after travelling approximately 200 km.
6
Guarantee
The statutory warranty period applies. If the product is defective, please contact the
service partner in your country (addresses on the back on the instruction manual).
Our experts will be happy to help you and will discuss the warranty process with you
in more detail.
8
CoolAir SP950C, SPX1200C
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Coolair spx 1200c

Tabla de contenido