Before Starting The Equipment; Care And Maintenance; Ordering Spare Parts - EINHELL BT-PS 1700 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 32
Anleitung_BT_PS_1700_SPK7:_
10.2 Inflation of air mattresses etc.
Important! Because of the material composition of
air mattresses, dinghys etc, no exact air pressure
indication can be given. Therefore make sure not to
inflate these objects too far, as they could burst.
Choose the appropriate adapter and screw this
onto the connecting part of the air hose.
10.3 Starting the compressor
Important! Before starting the compressor, please
read the "important notes" under point 1. After 10
minutes compressor runtime, a cooling off phase of
20 minutes is necessary.
Before switching on, test the pressure gauge
(Fig.1 Item 9).
To switch on, move the ON/OFF switch (Fig.
1/Pos. 11) to ON (I).
To switch off, push the ON/OFF switch (Fig.
1/Item 11) to 0.
11. Voltage transformer

11.1. Before starting the equipment

Before you connect the appliance to the mains
supply make sure that the data on the rating plate
are identical to the mains data of the 230 V
consumer.
Always pull the power plug before making
adjustments to the 230 V consumer.
Notes:
Observe the values from the provided output and
peak output rating (startup rating). Appliances
with higher power requirements must not be
connected.
Please note that appliances with an electric motor
(e.g. drills, etc.) need a significantly higher startup
rating than indicated on the rating plate. For this
reason it may be necessary to switch the voltage
transformer on and off several times. If the 230 V
consumer still does not start up, it cannot be used
because of the high startup rating.
Only one 230 V consumer is permitted to be
connected to each socket.
The use of multi-sockets is not permitted.
Features:
Surge protection / short circuit-protection
Undervoltage protection
Overheating guard
Acoustic alarm
22.08.2011
10:53 Uhr
Seite 17
11.2 Operation
11.2.1 Switching the voltage transformer
ON / OFF
To switch ON, push the ON/OFF switch (Fig.
2/Item 13) into position "ON" (I). The red LED
lights up, the voltage transformer is switched on
and ready for operation.
To switch OFF, push the ON/OFF switch into
position OFF (0). The red LED goes out, the
voltage transformer is switched off.
11.2.2 Switching off in case of error
Under the following circumstances the voltage
transformer automatically switches off:
Input voltage is lower than 10-10.5 V
The appliance overheats.
In these situations, switch OFF the appliance using
the ON/OFF switch and remove the attached 230 V
consumer. Check whether all of the ventilation
openings on the voltage transformer are clear and
switch the voltage transformer back on after about 10
minutes waiting time.

12. Care and maintenance

When carrying out cleaning or servicing, the
energy station must be switched off and all
connections must be removed from the
appliance.
Use a soft dry cloth to clean the surface, and do
not use any caustic solvents. If completely
necessary, you can remove dirt with a slightly
damp cloth.
13. Repairs
Only let an authorised expert from a customer
services workshop test the appliance if there are
possible errors.

14. Ordering spare parts

Please provide the following information on all orders
for spare parts:
Model/type of the appliance
Article number of the appliance
ID number of the equipment
Part number of the required spare part
For our latest prices and information please go to
www.isc-gmbh.info
GB
17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

10.912.30

Tabla de contenido