Site Provisions (Third Party Supply) - Novoferm NovoDock L530i Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3. Site provisions (third party supply)

3.1
EN
Site provisions (third party supply)
10
Mains power supply: 3 / N / PE AC 50Hz 230/400V
Mains fuse: D0 10A gl, Motor capacity: 1.5kW
11
Tube for electrical cable, inner diameter minimum of 70 mm,
curved through ≤ 45°
3.2
Required for installation
1
Leveller
2
Controls
3
Installation and user manual, control system
4
Quick start guide
4
1
This installation manual must be given to the customer and kept safely during the entire period of use!
13
1350
12
CEE power socket 16A
13
Door position sensor (optional)
General instruction: The image may differ at detail level.
5
Plastic plug
6
Cable clamp
7
Cable conduit (not included in the scope of supply)
General instruction: The image may differ at detail level.
10
12
11

Publicidad

Tabla de contenido
loading

Tabla de contenido