Installing A Payment System - Miele professional XCI-Box-LG Instrucciones De Manejo

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39

Installing a payment system

Payment system in timed operation
The wiring diagram is provided at the
end of these operating and installation
instructions in section  ("Timed op-
eration").
– C4030, C4031, C4065, C4070,
C4080
– C5003
Payment system in programme oper-
ation
The wiring diagram is provided at the
end of these operating and installation
instructions in section  ("Pro-
gramme operation").
– C4030, C4031, C4060, C4065,
C4070, C4080
– C5002, C5004
Legend
3 4
7-pin coupling of the payment
2 7 5
1 6
system
The 7-pin coupling of the pay-
ment system can be removed to
connect the cables directly with
the XCI box terminals.
XCI Terminal sockets of the XCI box
C
Schematic diagram of the elec-
trical circuit in the payment sys-
tem
Timed operation
Programme operation
Symbol for PE terminal (earth)
en - English
37

Publicidad

Tabla de contenido
loading

Tabla de contenido