,6!*+// 6$!= 5 8*!/$ $%+*A '0!'@
1.
Reduction gear
2.
Movement guide
3.
Flasher
4.
Antenna
5.
Photocell
6.
Manual release
4
Before starting installation, you should carry out the following checks, as well as making sure the structure is
compliant with current standards. Specifically:
•
Check that the wall and the ceiling above the garage door are in good condition, otherwise you will
need to include support brackets.
•
Make sure that the door' s travel is not obstructed in any way. The door must not have any friction.
Opening and closing movement must not be greater than 160 N ( 16kg.) If it is stopped in any position
it must not move. During movement it must not slip
•
Depending on the type of door, it may be necessary to apply a special adaptation arm, our Code:
900BOSEZ
May not be placed in service until the machine into which it will be incorporated has
been declared compliant with the provisions of EEC directive 22/06/98 n° 0037.
6
3
5
>.
2
1
2
@