Start Of Operation (B) - Rothenberger RODIADRILL 500 Instrucciones De Uso

Ocultar thumbs Ver también para RODIADRILL 500:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 28
4.2
Start of operation
Clamping into the drill rig (picture 1)
RODIACUT 250:
 Lock the feed gear on the drill rig.
 Use the supplied screws to fasten the swallowtail plate to the drill motor.
Please pay attention to the correct position of the feather key groove, bores and
fitting position.
 Slide the motor from the top as far as it will go into the swallowtail guiding on the drill rig and
tighten using both star handles.
 Check the tight fit of the motor.
RODIACUT 400 PRO:
 Remove the feed gear from the drill rig.
 Fasten the feed gear to the drill motor by means of the screws and a T-handle with ball end
attached to the drill rig.
Please pay attention to the correct position of the feather key groove, bores and
fitting position.
 Slide the motor together with the feed gear from the top into the guideway on the drill rig.
 Check the tight fit of the motor.
For this please read the drill rig instruction manual!
Changing the drill bit (picture 2)
Please wear protective gloves when changing the drill bit. The drill can become
hot after being in use for a longer period of time.
 Use an open-ended spanner (SW 36) to hold the drive shaft (1) and release and unscrew
(right-hand thread) the drill bit using an open-ended spanner (SW 24 for G 1/2" bits; SW 41
for 1.1/4" UNC bits).
Information: In the case of drill bits with a 1.1/4" UNC screw thread it is recommended to place
a copper ring (No. FF35190) between the drill motor and the drill bit. It is then easier to separate
the drill bits from the motor after drilling and any unevenness between the drill bit fitting and the
drive shaft is compensated.
Wet drilling (picture 3)
Wet drilling is only permitted with a faultless "PRCD". Always carry out work
using a water extraction device when wet drilling overhead. Protect the prime
mover from splash water.
 Water connection: Water connection (6) to a submersible wastewater pump (No. FF35029),
pressurized water tank (No. FF35026) or connecting a water line directly over a Gardena
water hose (7) using a two way adapter.
(There must at least be sufficient water pressure (max. 4 bar!) to move the arising drilling
mud from the borehole)
 Use the adjusting screws to fix both arms of the water extraction ring (No. FF35730) to the
base plate. Cut a hole into the rubber sheet somewhat larger than the diameter of the drill
bit. Connect the water extraction ring to the water extractor (No. FF35210).
Concerning this, please read the operating manual for the submersible water pump, pressurized
water tank or the water extractor appliance!
Optional: Dry drilling (picture 4)
 Screw the suction rotor (No. FF40056) onto the drive shaft (1).
 Attach the hose adapter and suction hose.
 Connect the vacuum cleaner (No. FF35148) to the mains supply.
For this please read the vacuum cleaner instruction manual!
14
ENGLISH
(B)

Publicidad

Tabla de contenido
loading

Tabla de contenido