Important information
About the mounting instructions
These mounting instructions come as part of the Duravit
bathtub and should be read carefully prior to installation.
Explanation of the key words and symbols
NOTE! For avoiding property damage
Link to installation information in this section
Inspection (e.g. for scratches)
Indication of the length of time (e.g. 10 minutes)
Inspect to check for leaks and tightness
Target group and qualification
The bathtub must only be installed by trained plumbing
engineers.
NOTE!
Local installation regulations and any country-specific
standards must be observed at all times.
Installation information
Please read pre-installation datasheets prior to the
installation. These are available to download on the
Internet at www.duravit.com.
12
Installing the tap unit (Diagram 12)
> The installation of the tap unit is described
in separate instructions and these should be
observed during the installation.
NOTE! Do not use the tap unit as a handle!
> Do not overload the tap unit (the maximum load of
the outlet is 5 kg).
28
Observing a clearance (Diagram 28)
> Observe a uniform clearance of maximum 2 mm
between the bathtub panel and the bathtub.
31
Checking the Bowden cable (Diagram 31)
> In the case of bathtubs with a pre-installed
Bowden cable, check the function.
35
NOTE! Observing the sealing time! (Diagram 35)
> Mount the bathtub panel immediately after
attaching the sealing strip to guarantee that it is
leak-tight.
37
NOTE! Taking maintenance into account! (Diagram 37)
> The bathtub panel must be accessible and
removable for maintenance.
BA_M_Sundeck_MV_kurze_Stele/12.11.2
5