7.3.2 Cable Routing
7.3.2.1 Front Mounted Units
1
Insert cable through the bottom of
the mast head.
2
Pull cable through to the top of the
mast head.
3
Insert cable into opening above
bottom pulley.
4
Pull cable over bottom pulley.
7.3.2.2 Back Mounted Units
1
Insert cable through opening;
over pulley and under metal bar,
at the back end of the mast.
4
Pull cable over pulley.
USE R I N S TR U C TIO N S - E N G L I SH
1
3
2
Pull cable through opening,
stringing along mast arm.
5
Reinsert pin.
28
3
Remove pin on mast head.
2
4