Preparation; Initial Start-Up And Longer Breaks In Use; Prior To Starting The Work Day; Before Each Patient - B.A. International BA Serie Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 163
6401553.book Seite 24 Montag, 13. Juni 2016 4:27 16
4 Preparation
24
Operating Instructions BA ULTIMATE POWER + / BA ULTIMATE
4

Preparation

4.1

Initial start-up and longer breaks in use

➢ Sterilize the instrument and accessories prior to startup.
Instrument
➢ Clean and maintain the instrument after longer breaks in use.
4.2

Prior to starting the work day

➢ Purge the water and air channels for 30 seconds.
4.3

Before each patient

1. Purge the water and air channels for 30 seconds.
Preparation _ Instrument
2.
CAUTION! Keep the motor running.
Insert the instrument [ → 27].
3. Insert the burr instrument [ → 28].
4. Set a sufficient amount of cooling water (> 50 ml/min) [ → 35].
64 01 553 D3551.201.03.03.02

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ba 200Ba 40Ba 60Ba 280Ba 250Ba 45 ... Mostrar todo

Tabla de contenido