CULUS Elica Guía De Instalación, Uso Y Mantenimiento página 18

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

additional hole/conduit.
d. Install drywall around duct and conduit;
then refinish ceiling, leave enough
clearance for easy installation of chimney
structure up to ceiling.
e. Tape Template in place and fit 4 screws
on mounting holes, do not tighten but
leave a space of 1/2", remove the
template.
3. Regulate chimney structure and fix all
assembly parts with 4 screws to each
bracket (16 screws in total), check
structure is well assembled.
Note: If supplied, temporarily remove the
screws fixing the reinforcement bracket to
the perforated frame (keep these screws
in a safe place) and position it over the
motor assembly.
The bracket should be fixed in place
again only after the perforated frame has
been fitted to the ceiling.
4. Hook the frame onto the 4 screws.
WARNING
Excessive Weight Hazard
Use two or more people to move and
install range hood.
Failure to do so can result in back or
other injury.
Make final angular adjustment to
structure at ceiling if necessary then
securely tighten 4 ceiling lag screws.
Fit six additional screws for definitive
fixing.
18

Publicidad

Tabla de contenido
loading

Productos relacionados para CULUS Elica

Tabla de contenido