Connect black wire from service panel to
black or red in junction box, white to white
and green to green-yellow.
Close and secure junction box cover.
7. Fit the control shaft in the correct position
by pushing it upwards.
Connect the electricity.
8. Join the two upper sections of the duct
covering the perforated frame.
Fix each individual section in place using
2 screws (1 per side) near the ceiling.
9. Fix the upper duct to the perforated frame
using 10 screws (5 per side).
10. Apply 2 casings (supplied) to cover the
fixing points on the upper duct sections
(CAUTION:
CASINGS ARE EASY TO RECOGNISE
BECAUSE THEY ARE WIDER, DEEPER
AND ARE FITTED BY PRESSING THEM
INTO PLACE).
20
THE
UPPER
DUCT