START-UP
You receive a completely assembled lifting magnet and a detailed operating manual. Please check the
condition of the goods upon receipt for any damage incurred during transport, and make sure the delivery
is complete. If you have any problems, please contact the manufacture immediately.
1. Follow the safety instructions. Clean the workpiece and the lower magnetic plate of the lifting magnet.
2. Position the lifting magnet at the centre of gravity of the load. The lifting magnet is pre-tensioned slightly
in order to avoid inadvertent slipping and droppingof the magnet (e.g. when used in a vertical or other
forced position).
3. Align the lifting magnet according to the desired application.
4. Turn the activation lever by 60° into the ON position until it audibly latches into place (with a slight tilting).
5. Move the load hook to the required position and lift the load by about 10 mm to check its deformation
and the magnetic holding force.
6. Now move your load slowly and smoothly. Avoid swinging or jarring.
7. After the load has been set down completely and safely, you can deactivate the lifting magnet. To do
this, push the activation lever at its far end upwards (1.) and move it into the OFF position (2.).
The maximum dimensions of the loads to be lifted depend to a large extent on the geometry and flexural
stiffness of the work pieces. This is due to the fact that, in case of bending, an air gap forms under the
magnetic surfaceresulting in a significant decrease of the load-bearing capacity.During each lift, watch for
any deformation of the work piece that might occur. If necessary, check for any air gap developing at the
edges of the TiN-coated magnetic surface (e.g. with a sheet of paper; 80g/m
!
Immediately stop the lift if there is any excessive deformation or an air gap.
Never exceed the dimensions and/or the load-bearing capacity of the material thickness
!
given in table 2 & 3.
).