Setting Up, Installation And Putting Into Operation - Heraeus PALA Palamat elite Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39
Detailed view – operating panel
11
12
13
GB
- 6 -
11) Heat key
12) Selection key for temperature stage
13) Pressure key
6

Setting up, installation and putting into operation

The unit must be placed on a solid, fire-resistant surface (laboratory desk: 500 x 370 x 500 mm) in a way to ensure a safe
horizontal position.
Ambient conditions:
Temperature range 0°C (32°F) to 40°C (104°F)
Relative humidity between 30% and 75%
Mains voltage ± 10% from the nominal value
Use only indoors
No direct exposure to UV light
Max. 2.000 m above sea level
Overvoltage category II
Pollution degree 2
Compressed air connection:
Connect to compressed air supply using the connection at the rear of the unit (7).
Maximum pressure: 10 bar.
Note!
The compressed air must be clean and dry!
Any guarantee claims shall be excluded in case of malfunctions or damage resulting from inadequate
compressed air supply!
(See special accessories chapter 4)
Mains connection:
Water drainage connection (silicone hose, red not included in the scope of delivery):
Connect hose connection with the connection for water drainage (9) at the rear of the unit.
Prior to operating, check whether the nominal voltage corresponds to the value indicated on the type plate
the unit. The unit must be connected to an earthing contact socket.
Unit may only be operated with the enclosed power cord!
If the power cord is exchanged, make sure that the sheathing of the power cord is suitable for the use
at a temperature of 100°C (212°F) (or above).
14) Start / Stop key
15) Timer
16) Timer plus / minus key
14
15
16

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

660530766605307766052725

Tabla de contenido