TRAPP ES-500 Manual De Instrucciones página 42

Ocultar thumbs Ver también para ES-500:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

www.trapp.com.br
Universal Base Installation
The universal base is provided with fixation points
dimensioned according to the trestle and to the
movable rails to fix the motor. Once the shredder and
the motor are placed on the universal base, align the
pulleys.
After that, fix the rubber cushions as shown in
the figure. Finally, place the belts which will have to
be stretched with the stretcher located at the base.
Assembling the Green Funnel
Fit the green funnel on the two supports of the machine as shown in the figures.
42

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Es-550Es-600Es-650

Tabla de contenido