Routine Maintenance Plan - entrematic Ditec QIK4E-7EH-7YEH Manual De Instalación

Ocultar thumbs Ver también para Ditec QIK4E-7EH-7YEH:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 85

13. Routine maintenance plan

Perform the following operations and checks every 6 months according to intensity of use of
the automation.
Disconnect the 230 V~ power supply and batteries (if present):
-
Clean and oil the levers and check the nuts and screws are all well tightened.
-
Clean and grease the articulated joint and spring-post as shown in the figure.
-
Check the electrical connections.
-
Check that the manual release is operating correctly.
-
Check that the bar is balanced correctly as shown on page 34.
-
[QIK4E] Check the capacity value of the motor condenser.
-
Check the state of wear of the mechanical parts, in particular the spring after about 300,000
work cycles.
Reconnect the 230 V~ power supply and batteries if present:
-
[QIK4E] Make sure the limit switches are working correctly.
-
Check that obstacle detection is operating correctly.
-
Check that all control and safety functions are working correctly.
i
N.B.: For spare parts, see the spares price list.
37

Publicidad

Tabla de contenido
loading

Tabla de contenido