Hilti HIT-RE 500-SD Manual De Instrucciones página 8

Ocultar thumbs Ver también para HIT-RE 500-SD:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 28
Hilti HIT-RE 500-SD
Adhesive anchoring system for rebar and anchor fastenings in concrete
Prior to use of product follow instructions for use and recommended safety precautions.
Check expiration date: See expiration date imprint on foilpack manifold. (Month/Year). Do not use expired product.
Foil pack temperature: Must be between 5°C – 40°C during use.
Base material temperature at time of installation: Must be between 5°C – 40°C.
Instructions for transport and storage: Keep in a cool, dry and dark place between 5°C – 25°C.
Material Safety Data Sheet: Review the MSDS before use.
Installation instructions: Follow the pictograms 1-14 for the sequence of operations and refer to tables 1-4
for setting details. For any application not covered by this document (e.g. "h ef " beyond values specified
in setting details), contact Hilti.
Drill hole with a hammer drill set in rotation-hammer mode. See tables describing setting details.
Clean hole: Cleaning method has to be decided based on borehole conditions.
Just before setting a fastening element, the borehole must be free of dust, water and debris by one of
the following methods:
Method 1 - for dry or water saturated concrete (refer to pictograms):
•Blow from the back of the borehole with oil-free compressed air (min. 6 bar at 6 m
ting the air extension 2 times until return air stream is free of noticeable dust.
•Brush 2 times with the specified brush size (brush Ø ≥ bore hole Ø) by inserting the round steel
brush Hilti HIT-RB to the back of the borehole in a twisting motion and removing it. The brush should
resist insertion into the borehole - if not, the brush is too small and must be replaced with the proper
brush diameter.
•Blow again with compressed air 2 times until return air stream is free of noticeable dust.
Method 2 - for standing water in the boreholes (e.g. water flows in cleaned borehole):
•Flush hole 2 times by inserting a water hose (water-line pressure) to the back of the borehole until
water runs clear.
•Brush 2 times with the specified brush size (brush Ø ≥ borehole Ø) by inserting the round steel
brush Hilti HIT-RB to the back of the borehole with a twisting motion and removing it. The brush must
produce natural resistance as it enters the borehole - if not, the brush is too small and must be repla-
ced with the proper brush diameter.
•Flush again 2 times until water runs clear.
•Important! Remove all water from the borehole and blow out with oil free compressed air until
borehole is completely dried before mortar injection.
•Continue with borehole cleaning as described by method 1.
The boreholes must be dry and free of debris, dust, water, ice, oil, grease and other contaminants
prior to adhesive injection. Inadequate borehole cleaning = poor load values
Insert foil pack in black foil pack holder. Never use damaged foil packs and/or damaged or unclean
foil pack holders.
8
Printed: 08.07.2013 | Doc-Nr: PUB / 5102026 / 000 / 04
/h) fully retrac-
3

Publicidad

Tabla de contenido
loading

Tabla de contenido