Installation - Mitsubishi AL2 Serie Manual De Hardware

Ocultar thumbs Ver también para AL2 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 292
α
2 Simple Application Controllers
8.2

Installation

When installing AL2-GSM-CAB refer to Figure 8.4.
Caution
• Persons trained in the local and national electrical standards must install or remove the
AL2-GSM-CAB.
• Turn off the power supply when installing or removing the AL2-GSM-CAB.
• Put the cover back on after either installing or removing the AL2-GSM-CAB.
• Under no circumstances will Mitsubishi Electric be liable or responsible for any
consequential damage that may arise as a result of the installation or use of this
equipment.
• Do not pull on the cord, otherwise the cable may be damaged.
• When communicating to
must be turned ON at the same time. If they are not started up at same time, the
series will not communicate via GSM modem.
• Disconnect all terminals from the power supply before removing the cover.
α
2 series via GSM modem, the power supply for both units
AL2-GSM-CAB 8
α
2
ENG-38

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Al2-14mr-aAl2-14mr-dAl2-24mr-aAl2-24mr-d

Tabla de contenido