Descargar Imprimir esta página

Orbegozo CFC 49120 Manual De Instrucciones página 22

Publicidad

CFC 49120
1. Open the packing carton and remove the fan.
2. Mark the center of the joist. Pass the power cables through the holes in the rack. Attach it to the ceiling
joist using flat washers, spring washers and fixing screws.
3. Connect the power cables to the terminal block. Make sure that the connections are well made and that
no piece of wire protrudes from the connection blocks. This product must be grounded - if no ground wire
is available, consult an electrician.
1. Plafond
2. Rondelles de serrage
3. Crochet de serrage
4. Soutien
5. Vis de fixation à gousset
6. Câble de masse
7. Rondelles élastiques
8. Rondelles
9. Vis pour le bois
10. Bornes de câble
11. Tige creuse
12. Vis de fixation
13. Rondelles plates
14. Bouclier supérieur
15. Aspa
16. Moteur
22

Publicidad

loading