floor must be flat as shown in figure 3, the 6 seats(broken line position)
must touchdown at one time.
3.
After adjusting it, put plate washers to support the bottom plate of the ma-
chine.
4.
Take out the leveling screws. At this position, fix the machine firmly to the
ground by 5/8" upset bolt.
5.
Connect the electric power cables to the machine with a circuit breaker
which is about 2m high above ground level.
6.
After electric connection, check the rotation of the bowl and the hook. Both
of them should rotate clockwise when looking overhead. If wrong, exchange
two power cables and test again until it is right.
7.
Push "UP" button. The head of the machine will move up to the top position
and stop automatically.
8.
In this position, we can test degree of tightness of bowl position guide rod.
Pull the trolley out of the machine. Repeat as above until the trolley can be
pushed in and pulled out easily. And then tighten the adjusting screws of the
bowl position guide rod as shown in Figure 5. At last, try to pull out the trol-
ley and push it in again to make sure the trolley can go in and out smoothly.