Cordivari Bollyterm Home Manual Del Usuario página 34

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

English
inside the machine.
The ducting must be carried out always starting from the connection of
the straight duct section (accessory element A).
A
Caution: Do not use external grids that entail high load losses, such
as insect meshes. The grids used must allow a good air passage.
The load loss of ducts (including grids and any other element) under
normal flow rate conditions must not exceed the pressure head made
available by the unit (60Pa).
IN ANY EVENT, DUCTING MADE WITH SEAMLESS PIPE WITH
A DIAMETER NOT LOWER THAN 125mm, MUST NOT EXCEED A
TOTAL LENGTH OF 8 METRES (INTAKE PLUS DELIVERY) AND 4
METRES OF BENDS.
To reduce noise and vibrations that may be transmitted through walls
• Install a flexible hose for air inlet/outlet ducts
• isolate vibrations due to the openings in the wall
• fix inlet/outlet air ducts using vibration dampers
The performances of the product are calculated in
accordance with the conditions defined by the EU
Regulation 812/2013 (Annex VII, Table 6, 3rd column).
However, the product can work with air sampling at a temperature
between +5 °C and +43 °C..
DUCTING EXAMPLES
- 34 -
Cod. 1910000001165 - nv01

Publicidad

Tabla de contenido
loading

Tabla de contenido