Twin-Star International 26TF8299 Manual De Instrucciones página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and diagram above. If any part is missing or damaged, do not attempt to
assemble, install or operate the product. Contact customer service for replacement parts.
Estimated Assembly Time: 60 Minutes
Tools Required for Assembly (not included): Phillips head screwdriver, scissors and utility knife
ASSEMBLY INSTRUCTIONS
1. Locate the Center Left Side Panel (B), Center
Right Side Panel (C), Center Shelf (D), and set
out face down on a scratch-free surface.
Insert one Wood Dowel (KK) into each of the
pre-drilled holes.
Push the Center Left Side Panel and Center Right
Side Panel snug to the Center Shelf. Using Bolts
(AA) and Washers (BB) attach these panels through
pre-drilled holes in the mounting blocks.
HAND TIGHTEN ONLY.
Hardware Used
Bolt
AA
BB
Washer
KK
Wood Dowel
2. Locate Hearth/Base (A) and set out finished side up
on the floor.
Insert one Wood Dowel (KK) into each of the
pre-drilled holes.
Attach the Completed Center Front assembly from
step 1 to the Hearth/Base (A). Using Bolts (AA) and
Washers (BB) attach panels through pre-drilled
holes in the mounting blocks.
HAND TIGHTEN ONLY.
Locate Left Side Panel (E) and Right Side Panel (F),
Then use Bolts (AA) and Washers (BB) through the
pre-drilled holes in the mounting blocks. Attach the
Side Panels to Hearth / Base (A).
HAND TIGHTEN ONLY.
Hardware Used
AA
Bolt
BB
Washer
KK
Wood Dowel
Fig. 1
x 4
x 4
x 4
Fig. 2
E
x 10
x 10
x 8
4
BB
AA
KK
D
C
A
KK
B
F
AA
BB

Publicidad

Tabla de contenido
loading

Tabla de contenido