Unpacking The Box - Tru-Test WaterPro 2 Guía De Instalación Y Servicio

Ocultar thumbs Ver también para WaterPro 2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Concrete and tank hole alignment
Check your measurements to ensure that the opening on the bottom of the tank aligns with the thermal earth
tube placement in the concrete. The opening on the bottom of the tank is off center. Ensure that the water
supply lines are not touching the sides of the thermal earth tube.
Underneath the WaterPro2

Unpacking the box

Recommended parts
In colder climates, we strongly recommend the use of one or more thermal earth tubes to help keep the vertical water
supply line from freezing. The thermal earth tube(s) must be long enough to extend 1 foot (305 mm) below the normal
frost line.
½ inch NPT male fitting to connect the vertical water supply line to the ½ inch flex line inside the tank. If your vertical
water supply line is more than ½ inch in diameter, you will also need an adapter.
250 W immersion heater for heating water in the tank (optional).
Recommended tools
Adjustable wrench
Pipe wrench
Measuring tape
Utility knife
Level
Hammer drill
½ inch masonry bit
Hammer
½ inch ratchet wrench
Caulk
4

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido