Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 227
A
B
C
7.
Fasten the connector cap (B) to the connector (C).
8.
Put back the connector in the frame.
9.
Fasten the cable gland (A).
A
/i
Contact
External refill
Fault message
Boiler interlock
BMS
10.
If an external contact (external refill, common fault,
and/or boiler interlock) or BMS is used, connect the
cables of the external contact or BMS to the correct
connector in the power box (A).
12
Connector
Blue
Grey
Yellow
Purple
English
B
A
11.
For internet connection, either connect the LAN
cable to the LAN connector (A), or connect the WiFi
dongle (optional) to the USB connector (B).
CAUTION
Make sure that the LAN cable does not touch
warm parts.
5.4
Commissioning
5.4.1

Filling the unit

A
1.
Open the valve (C) behind the pressure gauge (D).
2.
Open system valves (A and B).
The following processes will automatically
start:
-
The unit will be filled with water.
-
Air will be released.
-
The vessel pressure will equalise with
system pressure.
B
C
D
User manual - 3.0

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Spirovent superior s600-bSpirovent superior s600-r

Tabla de contenido