Palazzetti ECOFIRE Manual De Instalación, Uso Y Mantenimiento página 47

Pellet estufa
Ocultar thumbs Ver también para ECOFIRE:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

FRONT PELLET STOVE FOR BUILDING IN
The probe must be inserted near the lateral or
frontal air ventilation openings on the base of the
cladding.
Stick the probe support near the air vents (Fig.
6.3.6).
6.4 HOT AIR DELIVERY CONNECTION
6.4.1 Protection hood connections for heating
one room
Take the exible pipe by the ends and extend it,
rotating it at the same time (Fig. 6.4.1).
Cut it to the desired length (not more than 200 cm)
and install the vents at the desired locations.
Attach the pipe (1) to the collars (3) with the clamps
(2) (Fig. 6.4.1).
Insulate the pipes with rock wool.
Fix the vents on the hood or wall at a height of at
least 1,8÷2,0 m from the ground to prevent hot air
from blowing on people.
It is not advisable to run ducts for over 2 m.
6.4.2 Duct connections for heating several
rooms
To heat several rooms it is possible to install
metal air distribution ducts in accordance with the
following outline:
-
exible aluminium pipe - max. length 3-4 m per
duct
-
smooth metal pipe or duct - up to 10 m length
for a one-way duct, 5+5 m for a two-way duct.
Install one air outlet in the room where the replace
is installed; the second duct may be used to convey
hot air to the other rooms in the house.
Alternatively, connect the hot air delivery by means
of a exible pipe to the entrance of the distribution
channels.
The air distribution ducts must have an internal
crosssection of 20×20 cm, they must be constructed
in smooth galvanised sheet metal and insulated
with a 30 mm sheet of rockwool as a protection
from noise and heat dispersion.
(Fig. 6.4.2: A-Two-way duct, Fig.6.4.3 B One- way
duct).
When the fireplace is used to heat 2 or more
adjacent rooms, it is very important to promote air
circulation from one room to the other in order to
obtain an even temperature. To this aim, kindly t
air grilles on the doors or leave them ajar.
00 477 3370 - 09/2014 - PN - Italy
INSTALLATION
A
Fig. 6.4.2
Fig. 6.3.6
1
2
3
Fig. 6.4.1
B
Fig. 6.4.3
47

Publicidad

Tabla de contenido
loading

Tabla de contenido