2. Installation of the sewage treatment technology

The tanks must be placed on a level and firm base.
When selecting the location for the treatment plant, note that the sewage treatment facility must be con-
nected to the roof ventilation, or that a separate ventilation pipe must be connected to the facility.
2.1

Assembly of the pre-treatment tank (for UPtwo only)

The connection pipe is pushed through the tank between the first and second tanks. The tee is installed
on this pipe as a drain baffle.
2.2

Assembly of the disc diffusor in the SBR tank (UPone and UPtwo)

Hose to connect the disc diffusor,
pre-installed.
2. Installation of the sewage treatment technology
Cord to lower the disc diffusor into
the tank
Disc diffusor with weighted carrier
11 / 32