Assembly Of The Control Cabinet; Selecting The Location; Assembly Of The Inner Epp Cabinet - Graf UPone 3 EW Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Assembly of the control cabinet

3.1

Selecting the location

When selecting the location for the control cabinet, the following must be considered:
The control cabinet must be mounted above the highest water level in the tank to avoid overflow-
ing and water intake by gravity in case of an accident.
The system generates noise! When operating, the air compressor generates continuous noise
(comparable to that of a freezer).
The machine cabinet requires a separately protected electrical connection (16 amp, slow blow).
The electrical connection serves as a mains disconnecting device and must be easily accessible
at all times. Additional electrical fixtures on the same fuse may disrupt operation.
The location of the control cabinet must be a dry, cool and well-ventilated room. The cabinet, in
particular the ventilation vents, must not be covered and must be freely accessible for mainte-
nance work.
The air hoses should be no longer than 20 metres.
3.2

Assembly of the inner EPP cabinet

2 M10 bores must be made at a horizontal distance of 28 cm in the in-
tended locations on site to attach the cabinet. The front of the cabinet is
secured with a screw placed above the control. It must be released be-
fore opening the front. After introduction of the dowels and hanger bolts,
the EPP cabinet can be pushed onto the hanger bolts using the provid-
ed openings and fasted to the wall with the washers and wing screws.
3. Assembly of the control cabinet
14 / 32

Publicidad

Tabla de contenido
loading

Tabla de contenido