• Remove the transparent protection film and carboard containers
• Carefully lift the system off the palette
• Necessarily observe correct securing of the system at the load handling device
• Caution! Depending on system size and weight, you should do this with several people
• Remove the packaging according to the effective regulations
Caution! Do only use original TBH crane eyes, observe enclosed safety instructions!
4.3
Installation
Warning! This is a protection class 1 device and needs to be connected to the earth
conductor. For the connection to mains supply the attached or an identically constructed,
certified mains cable must be used. The power supply plug must remain accessible.
The extraction and filtration device is delivered ready to use. The device may only be connected to the intended voltage
(see type plate).
• Mount the collection equipment (hood, hose) and additional equipment if necessary. The density of the piping is
very important to prevent dangerous materials from leaving. If the filter are equipped during the installation it is
very important to check their correct seat. (Are all sealings pressed?)
• Make sure that the device is mounted correctly (brakes tighten)
• Optionally connect the remote control to the interface (see chapter 8)
• Connect the device to the mains
• Via switch „On/Off" turn on or off the device
4 Installation, Initial Operation
51-198